News
Ondo State Governor Akeredolu To Construct Cable Car At Idanre Hills

In a bid to make Idanre Hills more accessible to both local and foreign tourists, the governor of Ondo State, Arakunrin Oluwarotimi Akeredolu, has promised to build a cable car at the tourist center.
This promise comes after a twitter user named AkureHowFar suggested the idea to the governor. In its tweet, AkureHowFar captioned a picture of a cable car with :
“sir, we want in Akure”
@RotimiAkeredolu sir, we want in Akure ?#OndoAt44 https://t.co/qnlvGm2wMX
— AkureHowFar (@AkureHowFar) February 3, 2020
Responding to the AkureHowFar tweet, Governor Akeredolu said :
“Idanre first. The views of Idanre Hills from a cable car would be quite spectacular. It is a key piece of our tourism revitalization plans.”
Idanre first. The views of Idanre Hills from a cable car would be quite spectacular. It is a key piece of our tourism revitalization plans. #DevelopOndo https://t.co/vb287IiMjD
— Arakunrin Akeredolu (@RotimiAkeredolu) February 4, 2020
Replying to @RotimiAkeredolu, OndoAPC, who commended the Governor for accepting to build the Cable Car, added that :
“This will be in addition to the 16km virgin road from Akure – Idanre that Governor Akeredolu’s administration has constructed as part of its aim to open up Idanre for more amazing opportunities. Thank you, Arakunrin.”
The Idanre Hill, or Oke Idanre, located in Idanre town in Ondo State, is one of the most beautiful tourist centers in Nigeria. It includes such cultural sites as “Owa’s Palace, Shrines, Old Court, Belfry, Agbooogun footprint, thunder water (Omi Apaara) and burial mounds and grounds”.
But from time immemorial, the Idanre hills, which resides 3000 ft above sea level, has only one access road.
When the planned Idanre Cable Car is completed, the aerial ropeway system will provide an aerial link across the historic tourist attractions.
Each cabin on the cable car will be able to ferry a maximum of 8 adult passengers.
What Do You Think About The Planned Cable Car At Idanre Hills?
-
Related Post : Skyway String Transport Technology To Build Lagos To Abuja 45 minutes High-speed Light Rail Network
-
Latest Cars1 week ago
All-New 5th-Gen BMW X5 Adopts Neue Klasse Design, Introduces Electric iX5
-
Tech1 week ago
Soon, Older Teslas Will Also Have Access To Tesla FSD, Although They Will Be “Lite”
-
Autoshows & Awards1 week ago
Toyota GR GT, GR GT3 And Lexus LFA Concept Set For European Debut At Goodwood Festival Of Speed
-
News1 week ago
Volkswagen Is Reportedly Ending A €1.5 Billion Autonomous Vehicle Project
-
News1 week ago
Audi Nuvolari, First Customer Koenigsegg Gemera, Track-bred 2027 GRMN Corolla, Color-Changing Defender, News In June
-
News1 week ago
Lexus Has Lost Its Position As The Leader In Initial Quality. This Brand Surpassed It
-
News1 week ago
Honda’s Boss Says Nissan Deal Is Close To Completion
-
News1 week ago
Jim Farley Claims That Ford Needed Four Years To Resolve Its Quality Problems