News
Traffic Notice: Temporary closure of Apapa – Ijora link bridge in Lagos

Pix: lindaikejisblog.com
The Lagos State Government has announced the temporary closure of the Marine Bridge (Inward Ijora) for repair work. This bridge was inspected by Hon Minister of Power, Works & Housing, Mr Babatunde Fashola (SAN) on Thursday 4, August 2016 and the repair work commenced immediately.
We are encouraged to avoid this area if we can. However, the following alternative routes can be used if the visit to that area is inevitable:
- Traffic coming from Wharf Base/Point Road should divert at service Lane (Marine Beach Road) by Leventis Junction to Link Lilly Pond by Dockyard and ascend Ijora Bridge to continue their journey.
- Motorists traveling to Ajegunle should take a left turn at the second junction under the Apapa Road Bridge to Marine Beach Junction inward Ajegunle or back to Ijora Bridge and continue their journey.
-
News1 week agoCurrently, China Has 129 Manufacturers Of Electric And Hybrid Vehicles; The Majority Will Fail
-
News1 week agoLamborghini’s Next Model Will Be A Grand Tourer And Will Not Be Electric
-
News1 week agoHyundai Motor Workers Are On A 3-Day Warning Strike
-
News1 week agoBidding For This Stripped 2024 Mercedes-AMG G63 With No Rear End Surpasses $18,000 On Copart
-
News1 week agoFerrari Is “Very Happy” With The Luce’s Reactions
-
News3 days agoNissan Finally Discontinuing The Altima Sedan And Says Why
-
Car Facts6 days agoWhat Are The Most Reliable Electric Vehicles?
-
News3 days agoFor The First Time, Mercedes Is Using A Chinese Engine In A Vehicle Intended For The European Market

beamzy
August 11, 2016 at 17:40
Thanks for the information @Autojosh
AutoJosh
August 17, 2016 at 06:23
We thank God.